Noblejas

Year:

2013

Location:

Noblejas (TOL)

Project description

Pino Soria Burgos sawn timber with strenght class C-24 machined in a numerical control machining centre, for the “Bodega de la Rosa” winery construction historic restoration.

+ Madera PinoSoria projects